Realization: 2008 - 2009
Description: Steel structure and cladding of new Coal Handling at Ledvice Power Plant - Steel structure for coal conveying ( „Coal handling Bridges" ) T1 A,B ( reconstruction of steel structure, total renewal of surface coating, new cladding ), T2 A,B, T3 A,B, T6 A,B - supports, T9 A,B, T10, T11, Coal handling Towers, V1 ( install of new crane runway beams ), V2, V3, Crushing Station, Partial reconstruction of existing boiler-bunker building ( „Coal-Shower-Tower from T6 A,B belt conveyor to T7 A,B belt conveyor" - Steel structure of new technological floor, Roof steel structure and cladding of Coal-Shower-Tower T6/T7, Install of new crane runway beams above T7 A,B belt conveyor, Steel structure of new technological platform for coal dust - exhaust technology ).
Total Scope of work :
Total Weight of Steel Structure: 1.550 tons
Total Cladding Area: 19.350 m2
Insulated roof cladding: 4.350 m2
Insulated wall cladding: 4.200 m2
Uninsulated wall cladding: 4.850 m2
Flooring ( permanent shuttering ): 5.950 m2
Design of Steel Structure and Cladding.
Production and Erection of Steel Structure and Cladding.
> Back to Implementation> Downloadable reference sheet in PDF format