Realization
2012-2014
Description
Realization:
Basic design (initial project) 2008-2009
Detail Design (project realization) 2009-2011
Workshop documentation 2012-2013
Production and delivery of 08 / 2012-05 / 2014
Installation: 10 / 2012-12 / 2014
Place: Prunéřov, area Prunéřov II
Description:
Piping raw gas by 5.7 meters - 800 tons Tanks and absorbers
- 1200 t Technological steel structure
- 1700 t Customer: ANDRITZ Energy & Environment GmbH, Austria
Description:
- Design work from initial design to shop documentation
- The development control plan for production and assembly
- Quality control of production - Supervision of European Welding Engineer (IWE) on site
- Implementation of visual and capillary tests on site
- Production and delivery of steel structures
- Installation of welded and bolted steel structures
- Applications corrosion protection