Realization
2015
Description
Realization: Steel construction
project: 09 / 2015-10 / 2015
Steel structure: 10 / 2015-11 / 2015
Erection of steel structure: 10 / 2015-11 / 2015
Place: Outbuildings central warehouse bottler Pilsner Urqel in Pilsen
Description:
- The project dealt with a proposal supporting structures of steel structure outbuildings, including interior outfitting
- Development of the manufacturing and assembly drawings
- Preparation of documentation of actual construction
- Production and supply of steel structures outbuildings, including interior outfitting
- Erection of steel structures outbuildings, including interior outfitting
- Applications of corrosion protection visible in production and repairs on the assembly