Realization
2011
Description
Realization: 04/2011 - 08/2012
Place: Mladá Boleslav, Czech Republic
Description: Extension of existing buildings and changes in the assembly hall of M 13 Skoda Auto, Mlada Boleslav. Extension and modification of the existing hall assembly capacity will increase to 900 units of vehicles / day.
The planned extension is to create an area sufficient to ensure the increasing demands of the growing complexity of assembly equipment vehicles (equipment cockpit electrical and electronic systems), etc.
Workshop and erection documentation of all steel structures and secondary structures.