Description
Realization:
- Workshop manufacture of steel structure: 07/2009 - 12/2009
- Erection of steel structure: 12/2009 - 06/2010
Place: Chomutov, Czech Republic
Description:
- Project of load bearing steel structure of the ice hockey training hall;
- Designer's engineering supervision during the erection of supporting steel structure;
- Pre-stressing of tie rods Macalloy (lattice girder with tie);
- Tie rod axial stress measuring in situ by means of measuring of the rod eigenfrequencies.
Basic design, detailed design and workshop documentation of all supporting steel structures and secondary structures, supervision during the erection of supporting steel structure, axial stress measuring in the tie rods.