Realization
2020
Description
Realization:
01/2020 – 07/2020
Place:
OLYMP Sports Centre of the Ministry of Interior, Prague 7 – Bubeneč, Czech Republic
Description:
It is a demountable bobsleigh simulator structure, which is supported by a steel structure anchored to concrete footings. The structure is used as a training simulator for the start of bobsleigh racers. The entire bobsleigh training facility is rectangular in shape with main dimensions of approximately 115 x 3.5 m, including the roofing of the starting ramp on the east side.
Overall Scope of the Works:
• Complete detailed design and workshop documentation
• Earthworks + foundations
• Removal and installation of the steel structure (approx. 30.0 tons)
• Reinforced concrete structure of the starting ramp including TRP sacrificial formwork
• Final surface made of CONIPUR 2L material
• Safety barriers made of pressure-impregnated KVH prisms
• Roofing of the starting ramp with TRP