





Realization
2011-2013
Description
Realization: 04/2011 – 12/2013
Place: Počerady, Czech Republic
Category of construction:
Technology for Energy Description:
• Steel Constructions of Engine Rooms of a New Fossil Fuel Source in Počerady Power Plant Construction of the first significant fossil fuel source for generation of electric power in the Czech Republic was being prepared for several years and now is getting to its final phase of implementation. The new source is being constructed in Počerady Power Plant in a vicinity of existing coal power plant. The engine rooms containing turbines and generators represent an inseparable part of the whole technical structure of the fossil fuel power plant.
• Detail design of steel structure Engineering steam turbine.
• Fire resistance soluted as local fire.
• Reinforced concrete ceilings with drawn reinfor-cement of corrugated sheets.
• Workshop 3D model and workshop drawings of steel constructions Engineering flue gas turbines
• Workshop 3D model and workshop drawings of steel constructions Engineering steam turbines.
• Steel construction exported into the PDMS format, which served to coordinate the General designer steel construction and technology
• 3D computer models of coordination especially in solving secondary support structures internal distribution process steam.
• Detail design and installation of restraint system on the Engine steam and exhaust gas turbine buildings