Realization:
- Steel structure project: 06/2009-05/2012
- Workshop manufacture of steel structure: 08/2010-04/2012
- Erection of steel structure: 09/2010-05/2012
Place: Ostrava-Vítkovice, Czech Republic
Description:
- EXCON has carried out all levels of project of supporting steel structures and secondary structures (for cladding etc.);
- Workshop documentation of all supporting steel structures and secondary structures;
- Designer`s engineering supervision during the erection of supporting steel structures;
- Pre-stressing of tie rods Macalloy on central circular truss beam.
- Tie rod axial stress measuring in situ by means of strain gauges during erection.
- Project of the gas holder "roof" heavy lifting, including the designer`s supervision.
Basic design, detailed design and workshop documentation of all supporting steel structures and secondary structures, supervision of the supporting steel structure erection, tie rod axial stress measuring during pre-stressing.