



Realization
2014-2015
Description
Realization: 04/2014 – 12/2015
Place: Opatovice, Czech Republic
Category of construction: Technology for Energy
Description:
Retrofit project of desulphurization technology includes construction of two completely new lines of desulphurization. The aim of this investment is to further reduce SO2 emissions below 200 mg / m3. This step will be to meet the limits of European legislation, which will come into force from January 1, 2016.
• Detail design of steel structure of absorber and stair tower with lift for unit no. 3 and 4.
• Steel construction exported into the different format, which served to coordinate the General designer steel construction and technology.
• Support of manufactory and installation of designed steel structures.