





Realization
2014
Description
Realization:
Workshop documentations: 01/2014-02/2014
Fabrication of steel structure: 03/2014-04/2014
Erection of steel structure: 04/2014-05/2014
Place: Dolní Dunajovice, South Moravian Region, Czech Republic
Description:
The object of the project was technology building for RWE technology.
- Excon has carried out workshop documentations of supporting steel structures and secondary structures (for technology etc.).
- Delivery and erection of main steel structure and secondary structures for technology.
- Delivery and erection of cladding, including windows and doors.
- Designer`s engineering supervision during the erection of supporting steel structures